Industry News

Vale resumes operations at Viga plant

Views : 498
Update time : 2020-10-06 22:53:17
It was reported that Vale S.A. (Vale), a Brazilian multinational corporation engaged in metals and mining, is going to resume the concentration works at its Viga plant in Congonhas, Minas Gerais after a court decision.

Vale’s works at its Viga's B7 dam was forced to suspend for six days.

Due to the suspension, Vale’s iron ore production reduced by 11,000 tons per day, which meant there were 66,000 tons of decrease in iron ore output at the Viga plant totally.
Related News
Read More >>
Thyssenkrupp to temporarily halt electrical steel production in Europe Thyssenkrupp to temporarily halt electrical steel production in Europe
Dec .15.2025
Thyssenkrupp to temporarily halt electrical steel production in Europe
Novelis invests EUR 43 million in rail logistics to achieve CO₂e reduction Novelis invests EUR 43 million in rail logistics to achieve CO₂e reduction
Dec .15.2025
Novelis invests EUR 43 million in rail logistics to achieve CO₂e reduction
China to implement export licensing system for various steel products from 2026 China to implement export licensing system for various steel products from 2026
Dec .15.2025
China to implement export licensing system for various steel products from 2026
POSCO introduces new wear-resistant steel DuraPOS™ POSCO introduces new wear-resistant steel DuraPOS™
Dec .15.2025
POSCO introduces new wear-resistant steel DuraPOS™