Industry News

Baosteel's No. 3 blast furnace restarts

Views : 231
Update time : 2022-04-14 19:56:21
Baosteel's No. 3 blast furnace restarted after the overhaul. The blast furnace was put into operation in 1994 for the first time and upgraded to 4,850 cubic meters in 2013 with an annual iron production capacity of 3.98 million tons per year.

The No.3 blast furnace was shut down on December 22, 2021, with a maintenance period of 98 days. It lost about 1 million tons of pig iron production during maintenance.

This upgrade project will eliminate potential safety hazards in the daily production of blast furnaces, achieve clean and green production, and significantly improve service life.
Related News
Read More >>
Taiwan launches AD sunset review on Chinese aluminum foil Taiwan launches AD sunset review on Chinese aluminum foil
Feb .09.2026
Taiwan launches AD sunset review on Chinese aluminum foil
ArcelorMittal begins mining operations in Argentina ArcelorMittal begins mining operations in Argentina
Feb .09.2026
ArcelorMittal begins mining operations in Argentina
LME nickel prices bounce back despite second weekly loss LME nickel prices bounce back despite second weekly loss
Feb .09.2026
LME nickel prices bounce back despite second weekly loss
Walsin Lihwa reports Jan revenue drop but maintains positive forecast Walsin Lihwa reports Jan revenue drop but maintains positive forecast
Feb .09.2026
Walsin Lihwa reports Jan revenue drop but maintains positive forecast