Industry News

Baosteel's No. 3 blast furnace restarts

Views : 207
Update time : 2022-04-14 19:56:21
Baosteel's No. 3 blast furnace restarted after the overhaul. The blast furnace was put into operation in 1994 for the first time and upgraded to 4,850 cubic meters in 2013 with an annual iron production capacity of 3.98 million tons per year.

The No.3 blast furnace was shut down on December 22, 2021, with a maintenance period of 98 days. It lost about 1 million tons of pig iron production during maintenance.

This upgrade project will eliminate potential safety hazards in the daily production of blast furnaces, achieve clean and green production, and significantly improve service life.
Related News
Read More >>
NALCO reports 34.9% Q2 profit growth on record production NALCO reports 34.9% Q2 profit growth on record production
Nov .12.2025
NALCO reports 34.9% Q2 profit growth on record production
Guinea’s bauxite exports grow in Q1 2025, with strong outlook for 2026 Guinea’s bauxite exports grow in Q1 2025, with strong outlook for 2026
Nov .12.2025
Guinea’s bauxite exports grow in Q1 2025, with strong outlook for 2026
Kaiser Aluminum’s net income soars by 520% in Q3 2025 Kaiser Aluminum’s net income soars by 520% in Q3 2025
Nov .12.2025
Kaiser Aluminum’s net income soars by 520% in Q3 2025
India's secondary aluminum growth needs tax reform India's secondary aluminum growth needs tax reform
Nov .12.2025
India's secondary aluminum growth needs tax reform