Industry News

Indonesia’s Adaro Group planning expansion for aluminum smelter & power plant

Views : 402
Update time : 2022-12-29 18:49:09
PT Adaro Energy Indonesia Tbk, a leading coal mining company in Indonesia, is planning an expansion project for an aluminum smelter and power plant. The details of the process are being planned, and the construction process was expected to need 24 months.

This aluminum smelter, owned by Adaro Group’s subsidiary PT Kalimantan Aluminium Industry (KAI), will have an annual production capacity of 2 million tons, and the plant will be located in Kalimantan Industrial Park Indonesia, Bulungan, North Kalimantan.

Besides, a power plant will be built to support the demand for electricity from an aluminum smelter project, owned by PT Kaltara Power Indonesia, another Adaro Group’s subsidiary.
Related News
Read More >>
Aluminium price rallies sharply as LME cash offer spikes to $3,083.5 per tonne Aluminium price rallies sharply as LME cash offer spikes to $3,083.5 per tonne
Feb .11.2026
Aluminium price rallies sharply as LME cash offer spikes to $3,083.5 per tonne
Europe’s aluminium foil market decoded: Production and consumption drift apart, altering export–import balances Europe’s aluminium foil market decoded: Production and consumption drift apart, altering export–import balances
Feb .11.2026
Europe’s aluminium foil market decoded: Production and consumption drift apart, altering export–import balances
LME aluminium price: Cash offer dips 0.66% to $3,063/t; opening stock falls 0.41% LME aluminium price: Cash offer dips 0.66% to $3,063/t; opening stock falls 0.41%
Feb .11.2026
LME aluminium price: Cash offer dips 0.66% to $3,063/t; opening stock falls 0.41%
EGA brings forth the significance of its proposed Inola aluminium project amidst local opposition EGA brings forth the significance of its proposed Inola aluminium project amidst local opposition
Feb .11.2026
EGA brings forth the significance of its proposed Inola aluminium project amidst local opposition