Industry News

Thyssenkrupp strengthens HDG product portfolio with new galvanizing line in Dortmund

Views : 280
Update time : 2022-10-20 16:53:48
According to the German steelmaker Thyssenkrupp's announcement, the company has completed the construction of FBA 10, a new hot-dip galvanizing line with an annual capacity of 600,000 tons, which started production on October 13 at the Dortmund mill.

Thyssenkrupp said that the FBA 10 line will mainly produce material for automotive interior and automotive exterior panel applications. For now, Dortmund has two modern galvanizing lines with a total annual capacity of about 1 million tons.

Thyssenkrupp is further strengthening its portfolio of stronger and thinner premium steel through FBA 10 and will become the European center for high-quality galvanized steel products.
Related News
Read More >>
Aluminium price rallies sharply as LME cash offer spikes to $3,083.5 per tonne Aluminium price rallies sharply as LME cash offer spikes to $3,083.5 per tonne
Feb .11.2026
Aluminium price rallies sharply as LME cash offer spikes to $3,083.5 per tonne
Europe’s aluminium foil market decoded: Production and consumption drift apart, altering export–import balances Europe’s aluminium foil market decoded: Production and consumption drift apart, altering export–import balances
Feb .11.2026
Europe’s aluminium foil market decoded: Production and consumption drift apart, altering export–import balances
LME aluminium price: Cash offer dips 0.66% to $3,063/t; opening stock falls 0.41% LME aluminium price: Cash offer dips 0.66% to $3,063/t; opening stock falls 0.41%
Feb .11.2026
LME aluminium price: Cash offer dips 0.66% to $3,063/t; opening stock falls 0.41%
EGA brings forth the significance of its proposed Inola aluminium project amidst local opposition EGA brings forth the significance of its proposed Inola aluminium project amidst local opposition
Feb .11.2026
EGA brings forth the significance of its proposed Inola aluminium project amidst local opposition